How to Bid Commercial Landscape Maintenance Contracts

The six steps of a grounds-maintenance bid: the RFP, the site, the man-hour budget, the enhancements, the monthly number and the submission.

DOL lists grounds maintenance and landscaping (other than as part of construction) among covered service contracts

Federal grounds-maintenance contracts

SCA wage determinations apply

When the contract requires a performance bond or a performance and payment bond — FAR rule

Bid guarantee (federal contracts)

Required unless waived

O*NET task list for cost estimators — the closest available occupation

Estimator's site-visit task

Access, drainage, topography, utilities

Built per task from your crews' time on comparable properties

Man-hour figures

From your own records

A commercial landscape maintenance bid takes six steps, starting with reading the RFP's scope line by line, walking and measuring the property and budgeting man-hours from your own production records, and ending with presenting the bid in the exact format the buyer asks for. Enhancements price separately from the base scope, and where the buyer wants monthly billing, the annual price converts into monthly installments across the contract term. This page walks through each step, plus the federal contracting rules that come with grounds-maintenance work.

Reading the RFP and the spec sheet

A commercial maintenance bid starts with documents, not with a price.

The request for proposals (the RFP) tells you how the buyer wants to buy: the submission format, the deadline, the contract term, the insurance and documentation it requires, and how bids will be scored.

The specification attached to it, the spec sheet, tells you what the work actually is.

Read both before you form a number in your head.

Extract these from the spec sheet before you price anything:

  • The service schedule. Mowing cycles, trimming and edging, bed weeding and cultivation, shrub pruning, litter pickup, irrigation wet checks, and the cleanups the base price includes.
  • The exclusions. Work the buyer deliberately moved out of the base scope: mulch installs, annual color, irrigation repairs, tree work, snow. Exclusions are where enhancements live, so they matter as much as the inclusions.
  • The contract term and renewal language. How long the agreement runs, how the buyer can end it, and whether option years follow.
  • The insurance, licensing and documentation requirements. What the buyer requires you to carry and prove at submission. Which licenses your company needs for the work is your state's rule, not the buyer's list. Confirm it with your state's licensing agencies rather than treating the RFP as complete.
  • The scoring method. Whether the award goes on price alone or on price plus references, staffing, equipment and safety records.

Federal work adds a document built for the federal system: the wage determination.

The Department of Labor lists grounds maintenance and landscaping (other than as part of construction) among the service contracts covered by the McNamara-O'Neill Service Contract Act, so federal grounds-maintenance contracts carry SCA wage determinations.

That determination is part of the contract package on federal grounds-maintenance work, and what it requires for the workers on the contract is in the document itself.

Read it before you bid, not after you win.

Then decide whether to bid at all.

A bid/no-bid decision weighs the crew capacity you actually have in the season the contract starts, the drive between this property and your existing routes, and the term against your growth plans.

It also weighs any requirement (an insurance limit, a bond, a wage determination) you cannot meet.

Declining a badly fitted bid costs a stamp; winning one costs a crew you needed somewhere else.

Solicitations can change between cycles, and so can the rules behind them.

Read the current package rather than a copy of last year's bid, and confirm wage-and-hour questions with the DOL's Wage and Hour Division or counsel.

Measuring the site before you price

Price the property you walked, not the one the RFP describes.

Photos in a bid package go stale, and a written scope won't show you how a property actually mows, drains, gates and parks.

The site walk is where the bid stops being a guess.

Walk it with a measuring wheel or a measurement tool, and record what the crew will actually face:

  • Turf by section: open mowable area, slopes, and the strips and islands a mower cannot take at speed.
  • Beds and hardscape: bed square footage, linear feet of edging, and the hard surfaces the crew blows off.
  • Plant material: tree and shrub counts by size class, because pruning time scales with the plant, not the property.
  • Access: where a truck and trailer parks, gate widths, water sources, storage, security check-ins, dogs, and the traffic pattern at the entrances.
  • Drainage and obstacles: wet ground, standing structures, and the corners that hold debris.

O*NET's task list for cost estimators (the closest available occupation to a landscape estimator) includes visiting the site to record information about access, drainage, topography and the availability of utility services.

That task list is written for construction estimating, but the walk makes the same map for turf, beds and gates.

The walk builds your enhancement list, too.

Thin turf, tired mulch, overgrown shrubs, heads spraying the pavement: the spec says nothing about them, which is exactly why they get priced outside the base bid, in their own section of your proposal.

Keep the measurements, photos and notes in a file keyed to the site.

On a portfolio (an HOA, a campus, a multi-gate corporate property), measure the phases separately, because the crew serves them in pieces and the renewal negotiation starts from these notes.

Budgeting man-hours by task

The man-hour budget is the load-bearing wall of a commercial bid, whether the route is commercial lawn care or full grounds maintenance.

Take the service schedule from the spec, break it into tasks, and give each task a man-hour figure per visit from your own crews' records on comparable properties: mowing, trimming and edging, bed work, pruning cycles, litter, irrigation checks, cleanups.

Then multiply.

Man-hours per visit, times the visits the spec requires per task, summed across tasks, is the annual man-hour budget for the property.

On top of it sit the hours no task line captures: travel between the sites on the route, shop load-out in the morning, and supervision.

The Department of Labor's wage-and-hour rules treat travel from job site to job site during the workday as hours worked.

They treat travel from a required meeting place (the shop where a crew picks up tools or receives instructions, for example) to the job the same way.

The budget pays for windshield time whether or not a mower came off the trailer.

What those hours cost comes from your loaded labor rate; how to price landscaping jobs builds that rate from payroll, insurance and benefits.

Build the allowance in on purpose.

BLS describes cost estimators' estimates as accounting for allowances such as wasted material, bad weather and shipping delays.

Cost estimator is the closest available occupation to a landscape estimator.

Grounds maintenance runs into the same variables under other names: rain days, make-up visits, the growth surge after a wet week.

An allowance inside the budget is a decision; the same hours absorbed after the fact come out of margin.

On a crew, this estimating work belongs to the supervisor.

O*NET lists preparing service estimates based on labor, material and machine costs, and maintaining budgets for individual projects, among the tasks of first-line supervisors of landscaping, lawn service and groundskeeping workers (O*NET 37-1012; sample titles include Landscape Manager, Landscape Supervisor and Grounds Manager).

At a small company the owner holds the pencil, and the discipline is identical.

Close the loop after award.

BLS lists keeping records of estimated versus actual costs among cost estimators' duties, again the closest available occupation to a landscape estimator.

That record is what makes the next renewal bid sharper: actual hours per property, per visit, per task, against what you bid.

Trade business-management software exists to hold this.

Aspire, one vendor in the space, describes its estimating as letting users build templates and kits from their own production factors.

Your factors, not the vendor's.

What the budget never contains is a chart.

Our research did not find a published, verified source for landscape production rates (labor hours per unit of work), so any hours-per-task figure copied from a forum, a blog or a sales demo is somebody's estimate of somebody else's crew.

Your crews' time records are the only numbers that describe your crews.

Pricing enhancements outside the base scope

Enhancements are the work the spec deliberately leaves out of the base price: mulch refreshes, annual color rotations, aeration and overseeding, shrub and tree replacement, irrigation repairs, drainage fixes, and cleanups beyond the ones the contract includes.

On a commercial account they do three jobs at once: they solve problems the site walk surfaced, they give the property manager a way to spend budget that already exists, and they show service quality between renewals.

Price them outside the base bid, as unit prices the buyer can order against: mulch by the yard installed, annuals by the flat or the bed, aeration by the area treated, repairs against a written scope of work.

The units let the buyer compare your line items to another bidder's; the prices are yours to set from your own costs.

Attach the rate card to the bid itself.

A property manager who can order mulch, color and repairs by line item does it without a fresh negotiation each time, and your crews get work orders that match prices you set calmly at bid time rather than under pressure in July.

Keep enhancements out of the base price for three reasons.

First, comparability: the buyer scores base bids against each other, and enhancement dollars buried inside the base number distort the comparison.

Second, change orders: when the buyer adds work mid-term, a priced catalog turns the change order into a formality.

Third, job costing: enhancement revenue tracked separately tells you whether that work actually pays, which a blended number never will.

Follow the RFP's lead on structure.

If the solicitation prices enhancements as separate line items (bid now, awarded only when ordered), bid that structure exactly.

If it is silent, include a rate card anyway, so the structure is your choice rather than an argument later.

Winning the enhancement order is its own skill (reading the property manager, timing the proposal, pricing against the site walk), and it sits on the sales side of commercial work rather than the estimating side.

Getting the accounts in the first place is a separate project from pricing them.

Turning the annual price into monthly billing

A commercial maintenance contract prices the year, not the visit.

The buyer budgets grounds maintenance on the contract term, so the bid states a total annual contract price and, where the RFP asks for one, a monthly figure derived from it.

The arithmetic comes straight out of the work already done.

The annual man-hour budget priced at your loaded labor rates, plus the materials and equipment the base scope consumes, plus your overhead and your margin, is the annual contract price.

Divided by the months of service in the term, it becomes the monthly invoice the property manager expects.

Monthly billing evens the season out for both sides.

Spring growth, fall leaf cleanup and storm debris land in the same monthly number as the thin winter months, and the buyer gets one predictable budget line instead of an invoice that changes every month.

Your side of the trade is discipline: in a light month the payment is not free money.

It is the fee for the year's service, including the heavy months already priced into the annual number.

Keep what the spec carved out of the base scope outside the monthly amount.

Enhancements invoice as performed, against the rate card.

Services the RFP excluded (irrigation repairs, for instance) invoice against their own scope, and snow and ice management may sit in an entirely separate contract with response and risk terms of its own.

Monthly billing also assumes the contract runs its term, so read the termination, default and funding clauses before you commit crews to the schedule.

Contract language is legal territory: what you sign should be reviewed by counsel, not by an estimating sheet.

And it assumes the price still holds at renewal.

Reprice from the estimated-versus-actual hours the contract generated, not from last year's number plus a nudge, because the costs behind it, wages and insurance among them, can move while the contract runs.

Presenting the bid

Submission mechanics can decide a bid before anyone reads the numbers.

Follow the RFP's instructions exactly: the buyer's forms, their order, the file format or sealed envelope the package requires, the delivery portal, and the deadline.

A submission that misses a form or a signature can give the buyer a reason to set it aside without scoring it.

Federal work adds one more piece to the submission: the bid guarantee.

The Federal Acquisition Regulation requires a bid guarantee whenever the contract requires a performance bond or a performance and payment bond, unless waived.

The FAR defines it as security assuring the bidder will not withdraw its bid during the acceptance period and will sign the contract and furnish the required bonds.

If the solicitation requires bonds, bring your surety or insurance agent in early.

Bonding capacity takes time to arrange, and it is a question for the surety, not for the estimate.

The package itself should read like the spec's table of contents.

  • A cover letter naming the property and your understanding of the scope.
  • The completed forms, in the buyer's order.
  • The service schedule with frequencies.
  • The base price, annual and monthly.
  • The enhancement rate card.
  • Insurance certificates and license documentation.
  • References from comparable commercial properties.
  • The staffing plan: who runs the account and who is on the crew.

A reviewer can only score what they can compare, so the closer your package maps to their scoring sheet, the easier their job and the cleaner your read on why you won or lost.

After the decision, keep both outcomes working.

If you won, the estimated-versus-actual tracking starts on day one, because that record prices the renewal.

If you lost, ask for a debrief.

The buyer's procurement rules decide what they can share, and what you learn about the scoring is worth the phone call.

Commercial bidding compounds across seasons: every measured site, tracked budget and scored debrief makes the next bid sharper.

It is also one piece of hiring and running a landscaping company.

The man-hour budget in this bid is built from the wages, hours and drive time of the people you hire, and staffing the contract is the rest of that job.

Owner information, not legal, tax or insurance advice. Confirm federal wage determinations with the Department of Labor, bonding questions with your surety, licensing with your state agencies, and contract language with counsel.

Before you submit a commercial maintenance bid

  • Every spec line read, with the exclusions listed beside the inclusions
  • The site walked and measured, with photos keyed to the site file
  • A man-hour figure per task, from your own crews' records on comparable properties
  • Route travel, shop load-out and supervision hours inside the budget
  • A weather and make-up-visit allowance added on purpose
  • Enhancements priced as a unit rate card, outside the base price
  • The annual price computed, and the monthly figure derived from it
  • Termination, default and funding clauses read, with counsel for what you sign
  • The buyer's forms complete and in order, with insurance certificates and license documents attached
  • Your surety contacted early if the solicitation requires bonds
  • The submission delivered by the deadline, in the required format

Questions employers ask

How do you price a commercial landscape maintenance contract?

You price a commercial landscape maintenance contract from your own man-hour budget. Break the spec into tasks, assign man-hours per visit from your crews' records on comparable properties, multiply by the visits the spec requires, and price the total hours at your fully loaded labor rate. Add base-scope materials, equipment, overhead and margin. The total is the annual contract price, which monthly billing divides across the term where the buyer wants it. Enhancements price separately, as unit prices the buyer orders against.

What is a bid guarantee on a federal grounds-maintenance contract?

A bid guarantee is security assuring the bidder will not withdraw its bid during the acceptance period and will sign the contract and furnish the required bonds (the Federal Acquisition Regulation's definition). Federal contracts require a bid guarantee whenever they require a performance bond or a performance and payment bond, unless waived. If your solicitation requires bonds, involve your surety or insurance agent early, because bonding capacity takes time to arrange.

Do commercial landscaping contracts bill monthly?

It depends: the contract documents set the billing. Where a contract bills monthly, the annual contract price is divided into installments across the term, so spring growth and fall cleanup average into one predictable budget line for the property manager. Enhancements are invoiced separately as performed, and services the spec carved out (snow and ice management, for example) may sit in their own contract with their own terms.

Should I walk the property before bidding a commercial maintenance contract?

Yes. The walk gives you what the spec alone won't show: mowable turf by section, bed square footage, gate widths, slopes, drainage, parking and security. It also builds your enhancement list: thin turf and tired mulch become priced line items later. If the buyer schedules a pre-bid site visit or conference, treat attendance as part of reading the RFP rather than an optional errand.

More hiring resources

Won the contract? Now staff it.

A commercial award only holds if the crew exists to serve it. List the opening on LandscapingHires, where crew members, foremen, lawn care techs and irrigation techs look for their next crew.